In the spring of 1941, the German navy in the Mediterranean considered the expansion of its capabilities by adding a new type of vessel to support coastal traffic in North Africa, in particular for supply of smaller harbours such as Derna and Bardia, which could not be reached with large merchant vessels. The type of vessel was called a Marinefaehrprahm (MFP), or Naval Ferry Lighter. Because of their ‘F’ class designation, they became known as ‘F-Lighters’ to the Royal Navy. 

MFPs were originally designed after the experience with make-shift landing vessels in the preparations for the invasion of the UK in 1940 had shown that a specialist type was needed. The MFPs had a carrying capacity of 70/100 tons in adverse/good weather conditions, or three tanks, and displaced about 200 – 220 tons. They had broad front doors to unload through the bow, and were powered by diesel engines. The initially planned range of 120 nautical miles was quickly seen to be insufficient, and the design range grew to be sufficient to make the 420 nautical mile leg Tripoli – Benghazi without refuelling. The crew consisted of 14 men.

The planned use of the MFP was i) as transports, and ii) as escorts for other slow and unprotected transports. Thus even freight MFPs were reasonably well armed with light AA, captured 7.5cm guns, and depth charges to combat submarines.

MFPs during Operation CRUSADER

2. L-Flottille, a cover name meaning 2. Lehr-Flottille (2nd Instruction Flotilla) instead of 2. Landings-Flottille (2nd Landing Flotilla), was to become the main Kriegsmarine unit under which the MFPs operated in the Mediterranean. It was ordered to be established in mid-August 1941, with a first HQ at Palermo, where the MFPs were laid down at Cantieri Rinuniti Navale, and then Tripoli in Libya, as ordered on 9 October 1941, with a view to having it operate in the Tripoli-Benghazi zone. A total of 30 MFPs were foreseen at this time, in two lots of 15, of which 22 were to be built in Palermo, and eight in Varna, Bulgaria. 15 of these vessels had been ordered in April 1941, to be built in Italy. In October the Italian order was expanded by another 15, and in December another 20 were planned to be built. The intent was to grow the fleet to about 100 vessels.

The first ten MFPs were commissioned in Palermo in November 1941, MFPs F146 to F154 and F160. In the first half of December the remaining five of the first order, F155, to F159 commissioned. The latter two showed how quickly these boats could enter service. They were launched on 6 December, and commissioned on 10 December. 

Operations

Below are two pictures I came across in NARA a number of years ago. Apologies for the bad quality, the pictures were taken off a microfiche reader screen. They show the first MFP convoy to North Africa, which arrived in Tripoli at the end of November 1941. It consisted of four MFPs, F146, F148, F150, and F160. The four lighters had left Palermo on 22 November 41 to move to Trapani, where I presume they were loaded up for the trip. 

These four MFP went across without their 7.5cm guns, which only arrived in Palermo on 2 December 1941. They were subsequently equipped with these I presume. They were also expecting a 2cm AA gun each, from stocks in Benghazi.

Mfpconvoy

First MFP convoy on the way to North Africa. The escort is the Spica-class torpedo boat Perseo. Rommelsriposte.com collection.

Mfp160

3 December 1941, MFP160 sinking with 400 barrels of fuel and 10 tons of cement and diving gear, after the front loading doors gave way to wave impacts. Perseo is taking the crew off. Rommelsriposte.com collection.

Operations in North Africa

Following arrival at Tripoli, The MFPs were quickly loaded with urgently needed supplies and then dispatched to Benghazi on the coastal route, escorted by the torpedo boat Perseo. The load carried consisted of 800 barrels of fuel, 20 tons Italian cement, Draeger diving gear, 132 tons of equipment, and 20 tons of rations. Heavy weather during the crossing led to the loss of F160, when the bow doors failed. Perseo took off the crew. The remaining three vessels made it to Benghazi but had suffered heavy damage, requiring extensive repairs of up to two weeks, including further reinforcement of the overall structure.

The three survivor, having completed repairs, were then employed on coastal supply duties. They quickly became indispensable to the coastal convoy work. Most interestingly , F150 was sent to Bardia in mid-December to pick up tank engines, and F146 was sent to beleaguered Bardia on 20 December, with 70 tons food, 20 tons ammunition and 2 tons mail. This must have been a somewhat harrowing journey, since the Allies at this point controlled the Libyan coast almost up to Benghazi, and were running supply convoys up to Tobruk. F146 was then ordered to remain in Bardia to ensure supply between Bardia and Sollum. It was lost on 24 December to artillery fire, with all of the crew rescued.

A second batch was sent from Italy with 24 tanks in January, but got stuck at Pantelleria, when there were not sufficient escorts available, and finally reached North Africa at the end of February 1942.

 

 

Bardiatrip

Telegram to Naval Transport Command Italy, with information about the planned trip to Bardia. Rommelsriposte.com collection.

F146

Information about the loss of F146, transmitted to Tripoli via Rome. Note the time stamps – sent 1800/24/12, intercepted 13hr11mins later, released as decoded almost 60 hours later. TNA Kew, DEFE3/835

Fate

The first 15 MFPs constructed in Italy quickly diminished in number. Information about their fate during Operation CRUSADER is from the Historisches Marinearchiv at this link, and the information on those lost during CRUSADER is below:

  • F160 – sunk due to heavy weather and design weakness during initial move to North Africa on 3 December 1941 (see picture above)
  • F146 – set on fire and beached at Sollum due to enemy artillery fire on 24 December 1941
  • F151 – heavily damaged and partially submerged while unloading due to heavy weather. Finally destroyed by enemy air attack, 3 January 1942.
  • F148 – mined and sunk off Ras el Ali on 15 January 1942, with a load of 80 tons of gasoline

Five each were then lost in 1942 and 1943, and the last of this series, F155, ran aground off southern France and became a total loss.

10 thoughts on “The History and Operations of F-Lighters during CRUSADER

  1. Hi there. I found your blog while researching Die Brandenburgers and Sonderverband 288 on Google.
    I am writing for a Norwegian magazine, and I am to write an article about the Brandenburgers. At this time I am looking for pictures, which are hard to find. Is this something you might could help me out with ?
    Hope hearing from you. My email is: Stordal@visualcombat.com

    Like

  2. Hi Andreas
    Thanks for this article. I’m always interester in small Naval craft in the Med.
    I recently scratch built 2 MPF’s for my gaming in 20mm/1-72 scale. THe first one was a ‘C’ variant (to accomodate hte PzIV tank.
    The second one has the wider cargo hold (D variant) to accomodate PzVI-Tiger tanks. These were used to ferry Tigers to Tunisia.
    They have already participated in an Aegean game I ran recently.
    Can I attach a photo of my ferries? & if so how.
    thanks
    Richard

    Like

  3. Hi,
    My father ( 2NZEF – 24 BN) was captured at Sidi Rezegh 1st Dec 41. They were taken to Derna by lorry, then on a tram ride to a mountain barracks. From there they were put on the railway at Solok to Benghazi, and by ship to Tripoli. They were then put aboard a German ship ( my fathers notes), to be sent to Italy. I believe this was on 27th Dec. I have found out there were 2 possible ships. Vettor-Pisani (Italian?) left Tripoli with British POW on 27 Dec 1941, apparently the only ship to leave the harbour that day. On 30th Dec German ship MV Ankara left Tripoli with1400 POWs escorted by the destroyer Zeno to Naples.
    Do you have any further information re the Allied POW from Crusader being transported to Naples?
    Also in regard to the F-Lighters, were they used to transport allied POW’s Benghazi to Tripoli? If not, what ships were used in this period?
    Thanks
    Geoff

    Like

    • Hi Geoff, thanks for the comment. As I said on AHF, there is really only Vettor Pisani as an option. Ankara got a bomb hit in the hold, and hence had to leave a few days later. I unfortunately note that Vettor Pisani’s arrival is not noted in the Naples war diary of the German naval office, but I don’t think that means she didn’t arrive. She was an Italian ship and not carrying any German cargo the Germans may simply not have noted it down.
      I seriously doubt F-Lighters were used for POW transport in this period. They were open to the elements, and the weather was quite bad most of the time.
      On 11 Dec the light cruiser Cadorna left Benghazi for Italy with 800 POW, but she seems to have gone direct.
      On 16 December the small merchants Spezia and Cadamosto left Benghazi for Tripoli with 300 POW, where they arrived the next day. She was sunk on the return to Benghazi, off Benghazi, together with Cadamosto.
      On 21 Dec small merchant Brook left with 400 coloured POW (my guess is Indian, maybe some Cape Corps who were captured with 5 SA Brigade).
      On 21 December Ankara left Beghazi for Tripoli with 1,700 POW. She got there the next day.
      On 22 Dec merchant Ercole left for Tripoli with 1,400 white POW. She got to Tripoli the next day.